Skip to main content

Tunelgroup Cooling Systems

Cold Room Panels: 9 Essential Choices for Better Storage

Cold Storage Pioneer in Industrial Design

Cold Room Panels: 9 Essential Decisions for Reliable Cold Storage

Cold Room Panels form the insulated enclosure of a refrigerated facility. Selecting them requires a coordinated specification for thermal performance, joints, surface finishes, structural loads and installation details. The right combination depends on the room temperature, surrounding conditions, cleaning procedures and daily handling operations.

A freezer storing packaged meat has different requirements from a chilled vegetable room. A food preparation area washed every evening creates different demands from a warehouse holding sealed cartons. Even two rooms operating at the same temperature may need different panel specifications because their locations, traffic and construction details differ.

For the buyer, these differences matter before an order is placed. Panel thickness affects insulation and usable space. Floor construction affects vehicle access. Ceiling spans influence support requirements. Joint details determine how effectively the completed enclosure resists air and moisture entry.

This guide explains the decisions that deserve attention when specifying Cold Room Panels for a new facility, an extension or a replacement project.

Contents

  1. Define the operating conditions
  2. Assess the complete panel construction
  3. Select thickness using thermal performance
  4. Detail joints and vapour control
  5. Match surfaces to cleaning requirements
  6. Design the floor for actual traffic
  7. Coordinate ceilings, doors and equipment
  8. Verify fire performance and documentation
  9. Control installation and handover

1. Define the Operating Conditions Before Selecting Cold Room Panels

Start with a written description of how the room will operate.

“Frozen food storage” leaves several important questions unanswered. Will products arrive already frozen? Will warm products occasionally enter? Will the room operate continuously? Does the door open into an air-conditioned packing area or a loading bay exposed to outdoor humidity?

The following information should accompany a panel enquiry.

Project informationWhat to establish
Room dutyChilled storage, frozen storage, processing or rapid freezing
Operating temperatureNormal setpoint and expected operating range
Surrounding conditionsTemperature and humidity beside each wall and above the ceiling
DimensionsWhether measurements are internal clear dimensions or external dimensions
Product handlingPallets, shelving, trolleys, pallet trucks or forklifts
CleaningChemicals, wash temperature, frequency and application method
LocationInside an existing building or exposed to outdoor weather
Future changesExpansion, new equipment or a possible change in operating temperature

The distinction between internal and external dimensions deserves particular attention. A thicker wall panel reduces clear space when the building footprint remains fixed. Door clearances, rack positions and handling aisles should therefore be checked against the finished internal dimensions.

Future use should also be discussed early. Converting a chilled room into a freezer can require changes to the floor, vapour-control details, doors and refrigeration system. Record that possibility in the initial design brief.

2. Assess the Complete Panel Construction

An insulated metal panel normally combines an insulation core with two metal facings bonded to it. The core, facings and bond work together; specifying only the foam thickness leaves much of the product undefined. The Metal Construction Association describes this composite construction in its selection guidance for insulated metal panels. metalconstruction.org

PUR and PIR Cold Room Panels

PUR and PIR identify different insulation formulations. A useful comparison should examine the declared performance of the finished products:

  • Thermal conductivity and panel U-value.
  • Fire classification and its scope.
  • Facing material, thickness and coating.
  • Mechanical performance for the proposed application.
  • Joint construction and installation requirements.

Core density can help identify a specification, but it provides an incomplete picture of thermal, structural and fire performance.

Ask the supplier to identify the exact product being offered. Statements such as “high-density insulation” or “premium panel” should be accompanied by measurable properties and supporting documentation.

TunelGroup’s published cold room wall panel range includes polyurethane-core panels in 50, 60, 80, 100, 120, 150 and 200 mm thicknesses. The project enquiry should identify which thickness, facing and joint configuration is required. Tunelgroup Cooling Systems

3. Select Cold Room Panels Using Thermal Performance

Thickness is a useful purchasing description. Thermal performance determines how much heat passes through the enclosure.

Three terms commonly appear in technical documents:

PropertyMeaningHow to compare it
Thermal conductivity, λHow readily heat travels through a materialLower values indicate better insulation at comparable test conditions
Thermal resistance, RResistance to heat flow through a layer or assemblyHigher values indicate greater resistance
Thermal transmittance, UHeat transfer through a defined assembly per unit area and temperature differenceLower values indicate less heat transfer

Check whether a quoted U-value describes the panel centre, includes joint effects, or represents a more complete assembly. Compare values calculated using equivalent assumptions.

The steady-state transmission calculation used in the ASHRAE refrigerated-facility load guidance is:

Q = U × A × ΔT

Where Q is heat transfer in watts, U is thermal transmittance in W/m²·K, A is area in m², and ΔT is the temperature difference in kelvins. handbook.ashrae.org

An Illustrative Freezer Calculation

Consider a freezer with:

  • 500 m² of wall and ceiling area included in the comparison.
  • An internal temperature of −18°C.
  • A surrounding temperature of +35°C.
  • A temperature difference of 53 K.

Assume two alternative panel specifications have the following U-values:

CalculationOption AOption B
Assumed U-value0.25 W/m²·K0.18 W/m²·K
Area500 m²500 m²
Temperature difference53 K53 K
Calculated transmission load6.625 kW4.770 kW

The calculated difference is 1.855 kW of thermal load.

If these conditions remained constant for 24 hours, the difference would equal approximately 44.5 kWh of heat entering the room. The corresponding electricity consumption depends on refrigeration efficiency and operating conditions.

These are illustrative assumptions, independent of any particular TunelGroup product or thickness. The calculation excludes floors, doors, additional thermal bridges and air leakage.

How Should the Final Thickness Be Chosen?

Compare the available thicknesses using their declared thermal performance, installed cost, space requirements and expected operating conditions.

Include electricity tariffs, operating hours and refrigeration efficiency when evaluating the financial benefit of improved insulation. For outdoor installations, assess weather exposure and solar effects separately.

The complete equipment selection must also include product cooling, air infiltration, internal gains and refrigeration equipment loads. TunelGroup’s Cold Room Load Calculation Guide explains that broader calculation.

4. Detail Panel Joints and Vapour Control

Cold Room Panels meet at corners, ceilings, floors, door frames and service openings. These junctions deserve the same design attention as the main panel surfaces.

Warm, moisture-laden air entering a cold enclosure can produce condensation or ice. Moisture reaching the insulation can impair its performance. ASHRAE therefore emphasises continuity of the vapour-retarding envelope, particularly at joints and penetrations. handbook.ashrae.org

Prepare a Joint and Penetration Schedule

Before installation, identify the sealing detail for:

  • Panel-to-panel connections.
  • Wall-to-ceiling and wall-to-floor junctions.
  • Door frames and thresholds.
  • Refrigerant pipes and condensate drains.
  • Electrical conduits, sensors and cable trays.
  • Connections to existing construction.

In typical cold-store conditions, vapour control requires particular attention on the warmer side of the insulation. The precise seal arrangement should follow the approved system drawings.

Cam-locks help pull panels together. The specified gaskets and sealants complete the joint’s sealing function.

Every later modification should follow the same discipline. Adding a cable through a finished wall creates another penetration that needs a durable, compatible seal.

5. Match Panel Surfaces to the Cleaning Process

A panel finish should be selected against the conditions it will encounter.

A dry storage room holding sealed cartons may have a relatively mild cleaning regime. A meat handling room can experience frequent washing, splashing, chemical exposure and trolley impacts.

The Codex General Principles of Food Hygiene calls for durable, maintainable construction and surfaces that can be cleaned effectively. It also addresses layouts and overhead construction that reduce contamination risks. fao.org

Before selecting the facing, give the supplier the proposed detergent and disinfectant details, including concentration, contact time, application temperature and rinsing procedure.

Request confirmation of compatibility for the coating, exposed metal, sealants and trims. Where stainless steel is proposed, specify the grade and finish.

Practical details matter just as much as the sheet material. Wall bases should be accessible for cleaning. Protective rails should avoid creating inaccessible dirt traps. Exposed insulation edges need suitable closures.

The phrase “food-grade panel” should be supported by documentation relevant to the intended application and exposure.

6. Design Cold Room Floor Panels for Actual Traffic

Floor selection requires a separate load assessment.

A uniformly distributed load rating describes a different condition from a loaded pallet truck turning on small wheels. Rack feet concentrate weight into limited areas. Forklifts introduce wheel loads, braking forces and repeated traffic.

Manufacturers distinguish between modular floors and heavier-duty constructions according to these operating demands. KPS Global

Specify the Loads That the Floor Will Experience

Provide:

  • The maximum combined vehicle and carried load.
  • Wheel dimensions, material and load distribution.
  • Rack-leg loads and baseplate dimensions.
  • Traffic frequency and turning areas.
  • Threshold and ramp requirements.
  • Cleaning and slip-resistance requirements.

Ask for written confirmation that the complete floor assembly suits those conditions, including its supporting base.

TunelGroup’s cold room floor panels should be evaluated against the intended handling equipment and floor layout. Some applications require an engineered insulated concrete floor or an approved load-distributing construction.

For below-zero rooms over ground, also assess the possibility of freezing beneath the floor and resulting frost heave. Underfloor heating or another engineered prevention method may be required. handbook.ashrae.org

Complete the floor design before fixing door elevations. Thresholds, finished floor levels and vehicle access are difficult to correct after installation.

7. Coordinate Ceilings, Doors and Refrigeration Equipment

A panel ceiling needs a defined structural arrangement.

Confirm the clear spans, support positions, attachment details and permitted loads for the selected panel. Maintenance access and suspended equipment require explicit consideration; insulated ceilings may need dedicated supports. handbook.ashrae.org

The coordination drawing should show who supports each item:

ComponentDetail to resolve
Ceiling panelsSpan, bearings, hangers and connections
EvaporatorsEquipment supports and service clearances
Pipework and cable traysSupport routes and insulated penetrations
Door assembliesFrame support, opening reinforcement and threshold
Maintenance accessApproved walkways or access arrangements
Room pressure controlRequired devices and their installation details

Heavy equipment should have an approved load path. Any attachment to the panel assembly needs a documented detail.

Door openings should be coordinated with trolley and pallet dimensions, turning space and the finished floor level. An opening that works on a plan can still restrict handling once frames, protective barriers and equipment are installed.

The layout should also preserve evaporator airflow and service access. Coordinate the enclosure with the selected refrigeration units before panel production begins.

8. Verify Fire Performance and Technical Documentation

Fire documentation should identify the exact panel construction and the conditions under which its classification applies.

Two terms frequently appear in specifications:

TermWhat it addressesRelevant European classification reference
Reaction to fireA product’s behaviour when exposed to fireEN 13501-1
Fire resistanceAn element’s ability to maintain specified functions during fire exposureEN 13501-2

These are separate assessments. BSI describes their respective scopes in its guidance for EN 13501-1 and EN 13501-2. knowledge.bsigroup.com

Check the classification report against the proposed core, thickness, facings, joints, orientation and installation arrangement. Confirm that openings and service penetrations are addressed where relevant.

Documentation to Request for Cold Room Panels

For each proposed product, request the applicable:

  • Technical datasheet and product identification.
  • Declared thermal properties.
  • Structural load and span information.
  • Fire classification documentation.
  • Installation and maintenance instructions.
  • Declaration of Performance or other conformity documents required for the destination market.

EN 14509 covers specified factory-made metal-faced insulating panels, including cold-store applications for walls and ceilings. Its scope should be checked against the actual product and intended use. knowledge.bsigroup.com

Agree the required documentation with the project designer and relevant approving parties before purchasing.

9. Control Installation, Inspection and Handover

A detailed specification becomes useful when the delivered and installed work can be checked against it.

Before Assembly

Confirm the base is suitable, dimensions match the approved drawings and panel identification corresponds to the delivery schedule. Inspect facings, edges and joints for transport damage.

Resolve discrepancies before panels are concealed by trims or adjacent construction.

During Assembly

Follow the approved sequence for alignment, locking, sealing and fixing. Inspect seals while they remain visible.

Remove drilling and cutting debris promptly. Metal filings left on panel surfaces can oxidise, stain the finish and contribute to coating damage. Use the manufacturer’s approved cleaning methods and avoid tools that abrade the coating. metlspan.com

Protect the finished surfaces from subsequent trades. Equipment installation often introduces additional penetrations, impact damage and unapproved fixings.

At Handover

The handover package should include drawings, product references, maintenance instructions and photographs of concealed junctions.

Check doors, thresholds, exposed seals and service penetrations. During initial operation, investigate localised condensation or frost and confirm the cause before accepting the installation.

Record how future repairs and penetrations should be carried out. This gives maintenance personnel a practical reference when the room is modified.

Recommended and Not Recommended Practices

RecommendedNot Recommended
Compare declared thermal performance under equivalent assumptionsChoose exclusively by nominal thickness
Confirm wheel loads and rack loadsTreat a distributed floor rating as a vehicle rating
Coordinate supports and service openings before manufactureLeave major structural details to site improvisation
Match finishes to documented cleaning conditionsSelect a coating solely by colour or appearance
Check the scope of fire classificationsInfer a complete fire rating from the insulation name
Inspect joints before they are concealedRely only on a final visual inspection
Compare complete installed scopesCompare quotations using panel price per m² alone

Comparing Cold Room Panel Quotations

A useful quotation should make its quantities and assumptions visible.

Check whether the quoted area includes walls, ceilings, partitions and floors. Establish how door openings are treated, whether cutting waste is included and which dimensions form the basis of measurement.

For a facility with several rooms, prepare a partition schedule. A shared partition is one physical assembly, although its temperature exposure and structural requirements still need assessment.

Then compare the accompanying scope: trims, sealants, fixings, supports, doors, protective elements, packaging, transport, unloading, installation and commissioning responsibilities.

An apparent price difference may reflect a substantial difference in what is being supplied.

Planning Your Cold Room Panels with TunelGroup

A productive enquiry starts with a drawing and an operating brief.

Send TunelGroup the room layout, country and installation location, temperature requirements, surrounding conditions, door schedule and handling equipment details. Include cleaning requirements and any required technical classifications.

For an existing facility, photographs of the floor, roof structure, access route and service connections help clarify installation constraints.

The TunelGroup wall panel range provides a starting point for discussing thickness and construction. The quotation should then identify the proposed configuration, included accessories and interfaces with the floor, doors and refrigeration equipment.

This approach gives the buyer a specification that can be reviewed, compared and checked during installation.

Frequently Asked Questions About Cold Room Panels

What thickness should Cold Room Panels have?

Select thickness using the declared thermal performance, operating temperature, surrounding conditions and project requirements. Include structural demands and the economic value of reduced heat transmission.

Can wall panels also be used as floor panels?

Use a construction specifically approved for the floor application. Floor suitability depends on the complete assembly, support conditions, surface finish and expected point or rolling loads.

Does a thicker panel always justify its additional cost?

Evaluate the reduction in transmission load against the additional installed cost. Operating hours, temperature difference, electricity tariffs and refrigeration efficiency influence the result.

Can existing Cold Room Panels be reused?

Inspect their condition and confirm the original specification, joint compatibility and suitability for the new room. Damaged facings, wet insulation, altered joints or missing identification may limit reuse.

What should be checked when condensation appears?

Record its location and the surrounding temperature and humidity. Investigate joints, door seals, penetrations, thermal bridges and operating conditions. The repair should address the identified cause.

Conclusion

Well-specified Cold Room Panels connect the thermal, structural and hygienic requirements of a refrigerated facility.

The most useful purchasing documents show how those requirements will be met: declared thermal properties, coordinated drawings, suitable floor construction, verified supports, sealing details and a clear installation scope.

Resolve these decisions before manufacture. They determine how effectively the enclosure can be installed, maintained and adapted throughout its service life.

Author: Hamza Ilıman